Available on 2024-12-02 (US servers)
Available on 2024-12-03 (Europe servers)
Available on 2024-12-05 (Japan servers)
Planned for 2024-12-09 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.81 (pdf) | Release Certificate | JPMA EDC Checklist | EDC管理シート
Available on 2024-10-08 (US servers)
Available on 2024-10-09 (Europe servers)
Available on 2024-10-17 (Japan servers)
Available on 2024-10-21 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.80 (pdf) | Release Certificate | JPMA EDC Checklist | EDC管理シート
Release notes updated 2024-07-19
Available on 2024-06-20 (US servers)
Available on 2024-06-26 (Europe servers)
Available on 2024-08-28 (Japan servers)
Available on 2024-09-04 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Viedoc Coder has been updated with several new features, which are available for new studies started after the 4.79 release. For Viedoc Coder, new studies are defined as when a dictionary instance is added to a study’s scope for the first time. Later, all studies, existing and new, will be updated to use the new Viedoc Coder. This update will be communicated well in advance.
The new Viedoc Coder launches in a new browser tab and has a new look and feel for statistics on the Overview page. Access to subject data is improved which allows for easier query raising. Also, coding terms have changed to: Approve/Reject/Reset.
In Viedoc Admin, the Design Revision Impact Analysis tool is introduced to let Admin users with the new system role Design Impact Analyst, see what impact a design revision will have on existing form instances before applying the revision.
A user with this role can use the new Impact analysis button on the Apply revision tab in the Design settings window to perform the impact analysis. The new revision summary column, Req confirmation, shows the number of existing form instances per site that require confirmation by site staff. The design impact analysis report can be downloaded in Excel format. Please note that before inviting a user with this role, we recommend that you read the Viedoc Admin User Guide in the Viedoc eLearning to understand when the design impact analysis report may reveal blinded information.
In Viedoc Designer, in Study settings, the following settings in a design revision can be edited: Selection View Settings, Subject ID Generation Settings, Subject status settings, eLearning settings, and Miscellaneous settings, removing the need to create a new design version for updates. The settings used are those in the latest effective design revision at a respective site.
In the Trial Master File view, in the Document properties window, a validation for the year part of the dating convention value is added, to make sure that the entered value is a valid date.
Viedoc Me has a new identity provider for user authentication, offering better support for enhanced security and centralized user management. Automatic logout will occur after a certain time of inactivity or if the network connection is lost. For more information about the automatic logout, see the Viedoc eLearning.
The following updates to the ODM data export/import have been made to fix compatibility issues:
Please note that if you are using the ODM format for an integration and have used the data structure version “Latest Viedoc version”, the changes to the ODM export that are implemented in a new export version will be effective in your study and might potentially affect your integration. If you instead lock the data structure version to the current version, only some of these changes will be effective in your study.
Download Release Notes Viedoc 4.79 (pdf) | Release Certificate | JPMA EDC Checklist
Available on 2024-03-11 (US servers)
Available on 2024-03-14 (China servers)
Available on 2024-03-16 (Europe servers)
Available on 2024-03-23 (Japan servers)
Download Release Notes Viedoc 4.78 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2023-10-09 (Europe servers)
Available for 2023-10-06 (Japan servers)
Available for 2023-10-12 (China servers)
Available for 2023-10-26 (US servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Item-level SDV - Viedoc Admin/ Viedoc Clinic
In Viedoc Admin, a new study setting is available: Enable item-level SDV. When this option is selected, users with SDV permission can, apply SDV to individual items in a form within Clinic. The option is deselected by default, in Viedoc Admin, for studies that started before the release of Viedoc 4.77, and selected by default for studies that start after the release of Viedoc 4.77.
Document versioning - Viedoc TMF
In Viedoc TMF, support for document versions have been added. The document versions will add another level of versioning on top of the file versions that aligns with the Exchange Mechanism Standard (EMS).
Study design management – Viedoc Designer
Support for Improved design change management by allowing the role definitions to be changed in design revisions.
Browser Support - Viedoc Admin, Viedoc Designer, Viedoc Clinic, Viedoc Me
The browser no longer automatically translates pages. This is to make sure that end users see correct translations.
View roles user permissions - Viedoc Designer, Viedoc Clinic
It is now possible in Viedoc Designer to set a user permission to view the Roles page in Viedoc Clinic. This controls the permission for which roles have access to the information provided on the Roles page. This permission is selected by default for all roles.
Download Release Notes Viedoc 4.77 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2023-06-20 (Europe servers)
Available for 2023-06-21 (Japan servers)
Available for 2023-06-22 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
A new setting is introduced in Viedoc Admin: The subject edit lock. When this setting is enabled in Viedoc Admin, multiple users without edit permissions (for example, monitors and data managers) can, in Viedoc Clinic, work on the same subject that is being edited by a user with edit permission (for example, an investigator or a study coordinator). For more information about the subject edit lock, see the Viedoc Admin User Guide and the Viedoc Clinic User Guide in the Viedoc eLearning.
For security reasons, some file formats cannot be uploaded to the eTMF. For a complete list of the blacklisted file formats, see the Viedoc eTMF User Guide or the Viedoc User Guide for eTMF Managers in the Viedoc eLearning.
The browser no longer automatically translates the eTMF pages. This is to make sure that end users are seeing the correct translations.
The Form link item has now been introduced for Japanese PMS studies. This allows links to be created between forms containing related/dependent data for Clinic side users. Information from different forms or booklets can be easily connected and viewed by selecting the link in a form. This can be useful, for instance, to show complementary data, for example, the AE reports can link and be submitted together with forms regarding patient background and history. Sponsor side users can receive and view forms linked to other forms.
Download Release Notes Viedoc 4.76 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2023-04-25 (Europe servers)
Available for 2023-04-26 (Japan servers)
Available for 2023-05-03 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
In Viedoc Designer and Viedoc Clinic, the User role avatars in Viedoc have been updated to be more broadly representative of the plurality of our users.
In the Trial Master File view, on the Structure page, documents can now be filtered by Trial level. At the top of the filter menu, the option All documents is introduced, and Trial level is now an option on that menu. The Trial level option means that users can filter out the documents that are linked to that level only.
In the Trial Master File view, on the Structure page, it is now possible to see when documents are being uploaded even when there are filters set. Reloading the web page no longer resets the filters.
In the Trial Master File view, the format for date, time, and datetime is now inherited from Viedoc Admin>Study settings>Date & time format. This way, the eTMF follows the same pattern as the other Viedoc applications.
Download Release Notes Viedoc 4.75 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2023-03-07 (Europe servers)
Available for 2023-03-08 (Japan servers)
Available for 2023-03-09 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.74 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2022-11-29 (Europe servers)
Available for 2022-11-30 (Japan servers)
Available for 2022-12-01 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
In Viedoc eTMF, in the TMF Admin view, the version number of the structure is now appended to the end of the structure name instead of the “Customized” text. This change is available going forward, and the previous structure names won’t be affected.
In Viedoc eTMF, in the Trial Master File view, the document preview now supports displaying the contents of zipped folders without having to download them.
In Viedoc eTMF, in the Trial Master File view, the Details page now indicates deleted and inactivated zones, sections, and artifacts.
In Viedoc eTMF, the page header and the icon on the browser tab have a new design. This is another step in the implementation of a wider UI optimization across the Viedoc suite.
In Viedoc eTMF, in the TMF Admin view, the Settings tab has a new option under Structure: Show zone, section, and artifact numbers. When this option is selected, the Structure view in the Trials Master File view and the TMF structure page in the TMF Admin view display the zone, section, and artifact numbers and names in the same way as in the tooltip text that is displayed when hovering over them. The option is selected by default for new studies and deselected by default for existing studies.
In Viedoc eTMF, in the Trial Master File view, for Excel and CSV exports from the Details page, the file name of the generated file has been updated to be more informative. The file name is now StudyName_DetailsPage_YYYYmmDDHHMMSS. The timestamp is in UTC format. For Excel files, the included sheet name is now Details page.
In Viedoc eTMF, in the Trial Master File view, the Details page now includes the dating convention and the dating convention value in separate columns.
In Viedoc Admin, when sending email alerts with an attachment, it is now possible for Study Managers to enable password protection for the attached files.
In Viedoc Clinic, if the option to enable password protection for alert email attachments has been selected for a study, Clinic users will need the password provided by the Study Manager to open the attachments.
There is one new known limitation for Viedoc eTMF: For security reasons, the document preview in the Trial Master File view does not support ActiveX components.
There is one new known limitation for the Documentation and Training in Viedoc Clinic: When downloading a PDF of the Viedoc User Training Certificate, the generated PDF is limited to two pages. This means that when there are more training sections completed than can fit onto two pages, the PDF will not generate a third page and some of the training sections will be missing.
Download Release Notes Viedoc 4.73 (pdf) | Release Certificate | JPMA EDC Checklist
Available for 2022-11-01 (Europe servers)
Available for 2022-11-02 (Japan servers)
Available for 2022-11-07 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Viedoc Reports now has a modernized user interface. This is another step in the implementation of a wider UI optimization across the Viedoc suite. Also in Viedoc Reports, there is a new option in settings, which allows users to customize the page appearance by selecting to view the page in either light mode or dark mode. Due to the rise in popularity of the Viedoc Reports application, very large amounts of data are handled in the data sync. To reduce the response times, the daily data sync now operates on production data only. To sync demo data, use the on-demand sync option.
As of Viedoc version 4.71, the design version is printed on each page of the PDFs generated (annotated CRF, blank CRF, workflow, and configuration report) from Viedoc Designer. This is so users can easily identify which design version the respective settings belong to. In Viedoc Designer, improvements to the validation have been made to check for duplicate IDs, regardless of casing.
In the Study settings dialog, users can now generate and download the Admin audit trail report from the new Logs tab. The report contains information about all settings and changes of study settings that have been made by authorized users in Viedoc Admin. For a detailed description of the contents of the report, see the Viedoc Admin User Guide in the eLearning.
It is now possible to use the Web API to retrieve user information in a study. It’s also now possible to invite multiple users to different roles simultaneously through the Web API. Further, it is now possible to use the Web API to add a list of additional properties for specific users.
In Viedoc Clinic, it is now possible to search by Subject ID using the ‘Subject key’ parameter. This is a much faster search parameter than the ‘All data’, which must be selected to run. ‘Subject key’ is now the default search parameter. Also, the user can now cancel an ongoing search. Further, it is now possible to receive the form PDF attached to the alert email if configured in the study design.
In accordance with our UI optimization process, we have updated the look of the sign-in page, as well as the sign-up process.
Note!
Release Notes Viedoc 4.72 updated 2022-10-31. The sections ”New and updated functionality” and “Bug fixes” were updated to remove the updates for designer validation regarding the duplicated IDs.
Download Release Notes Viedoc 4.72 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2022-06-16 (Europe servers)
Available for users on 2022-06-23 (Japan servers)
Available for users on 2022-06-23 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
A powerful new function for displaying, sorting, and filtering documents by their metadata is introduced to Viedoc eTMF. The Details page is available to all users of the Trial Master File view, and it can show all the documents that a user has access to. When the document data has been filtered, sorted, and arranged according to the users’ settings, they can perform an export that exactly reflects their view.
In Viedoc Reports, a new PMS dashboard report is introduced as a standard report for Japanese PMS studies as well as a new Dashboard page. The PMS dashboard report allows data to be sorted to focus on the booklet status by site, subject, booklet, booklet history, or timelapse. The Dashboard page gives snapshots of the registration and study progress with terms specific to Japanese PMS studies, such as Registration status, Booklets initiated, the date of the first booklet for the first subject, and a last subject last booklet marker, estimating the date of the last submitted booklet for the last subject.
In Viedoc Admin, the API configuration has two tabs – a new tab for Web API client where users can add new Web API clients and edit or delete existing ones. There is also a tab for WCF API client (which has the same functionality as the previous version of the API configuration).
An optimized user interface is introduced for Viedoc Me. Study managers can select, for both production and training sites, which Viedoc Me interface trial patients will interact with. The new interface allows subjects to minimize and maximize the Viedoc Connect window during an ongoing call and also to navigate to other Viedoc Me pages and fill in forms while in a call on Viedoc Connect. There is also a new button notification that alerts the user when there is an active video call from anywhere in the app. The user can click on the button at any time from any page within the application to join a call.
Two new options for the Study settings in Viedoc Admin for PMS studies are introduced and are set to either mandatory or optional – Require Contract for booklet submission and Require Responsible Investigator for booklet submission. When these are selected, in Viedoc PMS, the Submit booklet dialog has fields for Contract and Responsible Investigator. If the options for linking the booklet to Contract and Responsible Investigator are selected in Viedoc Admin, the Excel export for PMS studies will contain two new columns on the Booklet status sheet: Contract Number and Responsible Investigator.
The Viedoc Web API now has the possibility to create and invite users. Contracts, Sites and User properties can be added through the Viedoc Web API and are included in the ODM formatted data export.
Note!
Release Notes Viedoc 4.71 updated 2022-06-21. Added known limitation for Viedoc Me.
Release Notes Viedoc 4.71 updated 2022-06-13. Revised section Bug fixes, updated with 3 additional bugs.
Download Release Notes Viedoc 4.71 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2022-05-06 (Europe servers)
Available for users on 2022-05-10 (Japan servers)
Available for users on 2022-05-12 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Note!
Release Notes Viedoc 4.70 updated 2022-05-02. Revised sections New functionality & Updated functionality.
Download Release Notes Viedoc 4.70 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2022-02-10 (Europe servers)
Available for users on 2022-02-10 (Japan servers)
Available for users on 2022-02-16 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.69 (pdf) | Release Certificate | JPMA EDC Checklist [updated 2022-03-16]
Available for users on 2021-11-25 (Europe servers)
Available for users on 2021-11-24 (Japan servers)
Available for users on 2021-11-25 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.68 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2021-09-05 (Europe servers)
Available for users on 2021-09-05 (Japan servers)
Available for users on 2021-09-06 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.67 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2021-06-10 (Europe servers)
Available for users on 2021-06-10 (Japan servers)
Available for users on 2021-06-11 (China servers)
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Note!
Release Notes Viedoc 4.66 updated 2021-06-07. Revised sections Updated functionality & Known limitations.
Download Release Notes Viedoc 4.66 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2021-04-29
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.65 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2021-03-28
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Note!
Release Notes Viedoc 4.64 updated 2021-03-25. Revised section Known limitations.
Download Release Notes Viedoc 4.64 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2021-02-04
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.63 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-12-10
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.62 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-10-08
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.61 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-08-27
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.60 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-06-04
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Note!
Release Notes Viedoc 4.59 updated 2020-06-02. Revised section Known limitations.
Download Release Notes Viedoc 4.59 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-04-23
This release contains improvements to existing functionality, bug fixes, and the following new functionality:
Download Release Notes Viedoc 4.58 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-03-12
This release contains improvements to existing functionality, bug fixes, and the following new functionalities:
Download Release Notes Viedoc 4.57 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2020-01-30
Viedoc 4.56 release introduces the new feature Viedoc Logistics, enhacements to ViedocMe, and bug fixes.
Note!
Release Notes Viedoc 4.56 updated 2020-01-27. Revised sections Updated functionality and Bug fixes.
Download Release Notes Viedoc 4.56 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-11-14
Viedoc 4.55 release is a maintenance release that consists mainly of enhancements and bug fixes.
Download Release Notes Viedoc 4.55 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-10-17
Viedoc 4.54 is a maintenance release that consists of a set of enhancements and bug fixes.
Download Release Notes Viedoc 4.54 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-08-29
Viedoc 4.53 is a maintenance release that consists of a set of enhancements and bug fixes.
Download Release Notes Viedoc 4.53 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-06-30
Viedoc 4.52 introduces the following new functionality:
Note!
Release Notes Viedoc 4.52 updated 2019-06-30. Updated Bug fixes and Known limitations list.
Release Notes Viedoc 4.52 updated 2019-07-02. Added Updated functionality section.
Download Release Notes Viedoc 4.52 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-05-16
Viedoc 4.51 introduces the following new functionality:
Note! Release Notes Viedoc 4.51 updated 2019-05-15. Minor editorial correction.
Download Release Notes Viedoc 4.51 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-04-05
The main new functionality in Viedoc 4.50 release is the Organization specific eLearning.
Note! Release Notes Viedoc 4.50 updated 2019-03-29. Updated Bug fixes list.
Note! Release Notes Viedoc 4.50 updated 2019-04-04. Updated release date.
Download Release Notes Viedoc 4.50 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-03-14
Viedoc 4.49 is a maintenance release that consists of a set of enhancements and bug fixes.
Download Release Notes Viedoc 4.49 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2019-02-21
Viedoc 4.48 introduces the following new functionality:
Download Release Notes Viedoc 4.48 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-12-06
Viedoc 4.47 introduces the following new functionality:
Download Release Notes Viedoc 4.47 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-11-15
Viedoc 4.46 introduces a completely new eLearning that provides a more comprehensive user guide with detailed step-by-step instructions and more images and examples.
Download Release Notes Viedoc 4.46 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-10-04
Viedoc 4.45 is a maintenance release that includes a set of issue fixes and back-end enhancements.
Download Release Notes Viedoc 4.45 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-08-26
Viedoc 4.44 is a maintenance release that includes a set of issue fixes, back-end enhancements and improvements in the process of approving pending role invitations.
Download Release Notes Viedoc 4.44 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-06-24
Viedoc 4.43 is a maintenance release that includes a set of issue fixes and back-end enhancements. Besides that, the main updated functionalities in this release are:
Download Release Notes Viedoc 4.43 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-05-27
The main new functionalities in this release are:
Download Release Notes Viedoc 4.42 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-04-24
Viedoc 4.41 is a maintenance release that includes a set of issue fixes and back-end enhancements. Besides that, the main updated functionalities in this release are:
Note! Release Notes Viedoc 4.41 updated 2018-04-16. Updated release date.
Download Release Notes Viedoc 4.41 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-03-15
The main new functionalities in this release are:
Note! Release Notes Viedoc 4.40 updated 2018-06-15. Updated section "Updated functionality".
Download Release Notes Viedoc 4.40 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2018-01-25
The main new functionalities in this release are:
Download Release Notes Viedoc 4.39 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-11-23
Viedoc 4.38 is a maintenance release that includes a set of issue fixes and back-end enhancements. Besides that, the main updated functionalities in this release are:
Non-functional updates:
Note! Release Notes Viedoc 4.38 updated 2017-11-20. Updated known limitations list.
Download Release Notes Viedoc 4.38 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-10-09
The main new/updated functionalities in this release are:
Non-functional updates:
Note! Release Notes Viedoc 4.37 updated 2017-10-05. Updated the release date and section Alerts and trackers.
Download Release Notes Viedoc 4.37 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-08-24
The main new functionalities in this release are:
Download Release Notes Viedoc 4.36 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-06-01
The main new functionalities in this release are:
Download Release Notes Viedoc 4.35 (pdf) (updated 2017-05-31) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-04-20
The main new functionality in this release is:
Download Release Notes Viedoc 4.34 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-03-09
The main new functionalities in this release are:
Download Release Notes Viedoc 4.33 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2017-01-29
The main new functionalities in this release are:
Download Release Notes Viedoc 4.32 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-12-12
The new functionalities in this release are:
Download Release Notes Viedoc 4.31 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-11-17
The main new functionality in this release is:
Note! Release Notes Viedoc 4.30 updated 2016-12-21. Added a bullet explaining the new behavior of Alert emails in chapter Updated functionality.
Download Release Notes Viedoc 4.30 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-10-10
The new functionalities in this release are:
Download Release Notes Viedoc 4.29 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-08-25
The new functionalities in this release are:
Download Release Notes Viedoc 4.28 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-06-16
The new functionalities in this release are:
Download Release Notes Viedoc 4.27 (pdf) | Release Certificate | JPMA EDC Checklist
Available for users on 2016-05-19
The new functionalities in this release are:
Download Release Notes Viedoc 4.26 (pdf) | Release Certificate
Available for users on 2016-04-18
The new functionalities in this release are:
Download Release Notes Viedoc 4.25 (pdf) | Release Certificate
Available for users on 2016-03-31
The new functionalities in this release are:
Download Release Notes Viedoc 4.24 (pdf) | Release Certificate
Available for users on 2016-02-25
The main new functionality in this release is:
Download Release Notes Viedoc 4.23 (pdf) | Release Certificate
Available for users on 2016-01-28
The new functionalities in this release are:
Download Release Notes Viedoc 4.22 (pdf) | Release Certificate
Available for users on 2015-12-16
The new functionalities in this release are:
Download Release Notes Viedoc 4.21 (pdf) | Release Certificate
Available for users on 2015-11-19
The new functionalities in this release are:
Download Release Notes Viedoc 4.20 (pdf) | Release Certificate
Available for users on 2015-10-22
The main new functionalities in this release are:
Download Release Notes Viedoc 4.19 (pdf) | Release Certificate
Available for users on 2015-09-24
The main new functionalities in this release are:
Download Release Notes Viedoc 4.18 (pdf) | Release Certificate
Available for users on 2015-08-27
The main new functionalities in this release are:
Download Release Notes Viedoc 4.17 (pdf) | Release Certificate
Available for users on 2015-07-02
The main new functionality in this release is:
Download Release Notes Viedoc 4.16 (pdf) | Release Certificate
Available for users on 2015-06-04
The four main new functionalities in this release are:
Download Release Notes Viedoc 4.15 (pdf) | Release Certificate
Available for users on 2015-05-07
The five main new functionalities in this release are:
Download Release Notes Viedoc 4.14 (pdf) | Release Certificate
Available for users on 2015-04-09
The three main new functionalities in this release are:
Download Release Notes Viedoc 4.13 (pdf) | Release Certificate
Available for users on 2015-03-18
The four main new functionalities in this release are:
Download Release Notes Viedoc 4.12 (pdf) | Release Certificate
Available for users on 2014-12-19
The two main new functionalities in this release are:
Download Release Notes Viedoc 4.11 (pdf) | Release Certificate
Available for users on 2014-11-11
The main new functionality in this release is the addition of randomization to Viedoc 4.
Download Release Notes Viedoc 4.10 (pdf) | Release Certificate
Available for users on 2014-10-10
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.9 (pdf) | Release Certificate
Available for users on 2014-09-21
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.8 (pdf) | Release Certificate
Available for users on 2014-08-06
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.7 (pdf) | Release Certificate
Available for users on 2014-06-07
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.6 (pdf) | Release Certificate
Available for users on 2014-05-02
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.5 (pdf) | Release Certificate
Available for users on 2014-03-24
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.4 (pdf) | Release Certificate
Available for users on 2014-02-19
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.3 (pdf) | Release Certificate
Available for users on 2013-11-20
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.2 (pdf) | Release Certificate
Available for users on 2013-10-25
This release contains improvements to existing Viedoc functionality as well as new functionality.
Download Release Notes Viedoc 4.1 (pdf) | Release Certificate
Available for users on 2013-10-02
This is the first public release of major version 4.
This is not an upgrade but a complete rewrite of Viedoc including a new GUI and framework to support modern browsers and devices. Studies running on major version 3 must be migrated if upgrade to major version 4 is desired.
Download Release Notes Viedoc 4.0 (pdf) | Release Certificate
はい。21CFRpart11を含め、データプライバシー法などあらゆる規制の法令順守表明をお客様のご要望に応じてご用意いたします。
他社ベンダー様と比較する前に、まず一度Viedocをご体験ください。ご興味のある方はどなたでもViedocを無料でお試し頂けます。また、ご利用頂いているお客様の声を「顧客事例」ページに掲載しておりますのでご覧ください。
はい。必要に応じて、フォーム、イベント、患者レベルで署名が可能です。
はい。Viedocではフォームが保存された時点で全てのバージョンのフォームを保存し、担当医師の管理下にあります。
5分毎にバックアップを取り、暗号化して対になるMicrosoft Azureリージョンに複製されます。各インスタンスのフルバックアップは暗号化され、第三の場所にあるコールドストレージに転送され、24時間毎に読み込み、リストア、整合性テストが実施されます。